Original commit message from CVS:
* docs/pwg/advanced-clock.xml:
* docs/pwg/appendix-porting.xml:
* docs/pwg/intro-preface.xml:
* docs/pwg/other-base.xml:
* docs/pwg/other-manager.xml:
* docs/pwg/other-nton.xml:
* docs/pwg/other-ntoone.xml:
* docs/pwg/other-oneton.xml:
* docs/pwg/pwg.xml:
Document base classes, update sections of n-to-1 and 1-to-n (muxer,
demuxer), remove n-to-n (was never written), fix some code examples
and links and update the porting section to include all this.
Original commit message from CVS:
* docs/pwg/advanced-events.xml:
* docs/pwg/advanced-request.xml:
* docs/pwg/advanced-scheduling.xml:
* docs/pwg/appendix-porting.xml:
* docs/pwg/building-boiler.xml:
* docs/pwg/intro-preface.xml:
* docs/pwg/other-ntoone.xml:
Rewrite scheduling-chapter for scheduling model in 0.9. Add lots
of example code and explanation for pad activation, loop() and
getrange() functions and a bit more. Remove old comments pointing
to loop-functions.
* examples/pwg/Makefile.am:
Add loop/getrange examples.
Original commit message from CVS:
* docs/pwg/intro-preface.xml:
Hm, ok, so the brackets weren't really useful...
* docs/pwg/other-ntoone.xml:
Fix embarassing typo.
Original commit message from CVS:
2004-02-02 Ronald Bultje <rbultje@ronald.bitfreak.net>
* docs/pwg/advanced-events.xml:
* docs/pwg/advanced-scheduling.xml:
* docs/pwg/intro-basics.xml:
* docs/pwg/other-manager.xml:
* docs/pwg/other-nton.xml:
* docs/pwg/other-ntoone.xml:
* docs/pwg/other-oneton.xml:
* docs/pwg/pwg.xml:
All sort of documentation... Forgot what. Point is that I want this
in before I leave. The 'other-*' will be the last section and will
explain issues specific to these type of elements.