mirror of
https://git.deuxfleurs.fr/Deuxfleurs/garage.git
synced 2024-11-14 04:01:25 +00:00
upgrade doc: fixes and precisions
This commit is contained in:
parent
6790e24f5a
commit
2448eb7713
1 changed files with 4 additions and 3 deletions
|
@ -25,7 +25,7 @@ The following are **breaking changes** in Garage v0.9 that require your attentio
|
||||||
The migration steps are as follows:
|
The migration steps are as follows:
|
||||||
|
|
||||||
1. Disable API and web access. You may do this by stopping your reverse proxy or by commenting out
|
1. Disable API and web access. You may do this by stopping your reverse proxy or by commenting out
|
||||||
the `api_bind_addr` values in your `config.toml` file.
|
the `api_bind_addr` values in your `config.toml` file and restarting Garage.
|
||||||
2. Do `garage repair --all-nodes --yes tables` and `garage repair --all-nodes --yes blocks`,
|
2. Do `garage repair --all-nodes --yes tables` and `garage repair --all-nodes --yes blocks`,
|
||||||
check the logs and check that all data seems to be synced correctly between
|
check the logs and check that all data seems to be synced correctly between
|
||||||
nodes. If you have time, do additional checks (`versions`, `block_refs`, etc.)
|
nodes. If you have time, do additional checks (`versions`, `block_refs`, etc.)
|
||||||
|
@ -62,7 +62,8 @@ The migration steps are as follows:
|
||||||
|
|
||||||
3. Prepare your binaries and configuration files for Garage v0.9
|
3. Prepare your binaries and configuration files for Garage v0.9
|
||||||
|
|
||||||
4. Shut down all v087 nodes simultaneously, and restart them all simultaneously in v0.9.
|
4. Shut down all v0.8 nodes simultaneously, and restart them all simultaneously in v0.9.
|
||||||
Use your favorite deployment tool (Ansible, Kubernetes, Nomad) to achieve this as fast as possible.
|
Use your favorite deployment tool (Ansible, Kubernetes, Nomad) to achieve this as fast as possible.
|
||||||
|
Garage v0.9 should be in a working state as soon as it starts.
|
||||||
|
|
||||||
5. Proceed with steps 9-12 above.
|
5. Proceed with repair and monitoring as described in steps 9-12 above.
|
||||||
|
|
Loading…
Reference in a new issue