Original commit message from CVS:
* gst/schedulers/gstoptimalscheduler.c: (add_to_group),
(remove_from_group), (normalize_group), (group_migrate_connected),
(gst_opt_scheduler_iterate):
* testsuite/schedulers/.cvsignore:
* testsuite/schedulers/Makefile.am:
* testsuite/schedulers/queue_link.c: (main):
Added testcase for schduler segfault.
Fix scheduler segfault when removing a decoupled
entry point as the last element from a group.
Original commit message from CVS:
* testsuite/schedulers/.cvsignore:
* testsuite/schedulers/Makefile.am:
* testsuite/schedulers/143777-2.c: (main):
add test for opt breakage in bug #143777
Original commit message from CVS:
* gst/gstbin.c: (gst_bin_iterate_func), (gst_bin_iterate):
don't
* gst/schedulers/entryscheduler.c: (safe_cothread_switch),
(safe_cothread_destroy),
(gst_entry_scheduler_remove_all_cothreads),
(gst_entry_scheduler_reset), (_remove_cothread),
(gst_entry_scheduler_state_transition):
hold off cothread destruction if we're not in main cothread
* configure.ac:
* testsuite/Makefile.am:
add new test dir
* testsuite/schedulers/.cvsignore:
* testsuite/schedulers/Makefile.am:
add tests
* testsuite/schedulers/relink.c: (cb_handoff), (main):
check relinking and adding/removing elements from a running pipeline
* testsuite/schedulers/unlink.c: (cb_handoff), (main):
check unlinking in a running pipeline
* testsuite/schedulers/unref.c: (cb_handoff), (main):
check unreffing a running pipeline
* testsuite/schedulers/useless_iteration.c: (main):
check iterating a pipeline that contains running threads works