Thibault Saunier
86ac3b3159 tests: Plug misc leaks 2019-04-15 17:11:48 -04:00
Thibault Saunier
adc4843f53 xml-formatter: Plug leaks of pending groups 2019-04-15 17:11:48 -04:00
Thibault Saunier
a46390ff56 Reimplement the timeline editing API
This is implemented on top of a Tree that represents the whole timeline.

SourceClips can not fully overlap anymore and the tests have been
updated to take that into account. Some new tests were added to verify
that behaviour in greater details
2019-03-15 23:51:55 +00:00
Thibault Saunier
7c5f2d11b2 timeline-element: Add a method to retrieve layer priority
Each timeline element is in a layer (potentially spanning
over several), it is very often useful to retrieve an element
layer priority (from an app perspective more than the element
priority itself as that is a bit of an implementation detail
in the end).

Port tests to it
2019-03-15 23:51:55 +00:00
Thibault Saunier
1c2784daa6 clip: Add a method to get the priority of the layer it is in
Just an helper method to get the 'priority of a the clip'
2019-03-15 23:51:55 +00:00
Seungha Yang
78b38f26a7 tests: init/deinit per test case
... in order to verify init/deinit pair.
2019-01-28 17:35:04 +09:00
Thibault Saunier
5e4770ccb9 tests: Initialize GES only once in the main process
Fixing calling deinit in a process where init was not called
when libcheck is forking.
2017-07-11 11:40:55 -04:00
Guillaume Desmottes
53c5bc069c introduce ges_deinit()
GstDiscoverer objects were leaked by tests making the leaks detector
unusable.
Introduce ges_deinit(), similiar to gst_deinit(), doing some cleanup
before exiting the process.

https://bugzilla.gnome.org/show_bug.cgi?id=776805
2017-02-06 09:49:20 -03:00
Thibault Saunier
a0ee7e1f44 timeline: Never change output media time when trimming start
+ Fix testsuite

https://bugzilla.gnome.org/show_bug.cgi?id=638802
2015-07-03 09:31:07 +02:00
Thibault Saunier
78913931b2 ges: Recompute Group priority when one of its clip.layer change priority
And add a unit test for that case where it was previously failing
2014-12-06 10:34:18 +01:00
Thibault Saunier
5665e3abb1 xml-formatter: Serialize groups
They were not serialized until now.

That implies several changes:

* Override GESTimelineElement [start, inpoint, duration] properties in
  GESGroup to ensure that those properties are not serialized as they
  should not be.

* Rename GESBaseXmlContainer->clips field to
  GESBaseXmlContainer->containers as the hashtable now contains Groups

https://bugzilla.gnome.org/show_bug.cgi?id=709148
2014-11-10 16:22:43 +01:00
Thibault Saunier
1adb9a0030 Add a notion of 'name' in GESTimelineElement
https://bugzilla.gnome.org/show_bug.cgi?id=729382
2014-05-02 16:27:25 +02:00
Thibault Saunier
9b050a54cd container: Properly handle the case where we could not set parent
In this case we had a FIXME about reverting everything that was done,
implement that FIXME!
2014-03-15 20:01:48 +01:00
Thibault Saunier
6e9e9338ae Revert "ges: Always create a project to back a timeline"
This reverts commit 59d83f1a93.

Conflicts:
	tests/check/ges/backgroundsource.c
	tests/check/ges/effects.c
	tests/check/ges/overlays.c
	tests/check/ges/simplelayer.c
	tests/check/ges/text_properties.c
	tests/check/ges/titles.c
2013-11-28 15:12:15 -03:00
Thibault Saunier
59d83f1a93 ges: Always create a project to back a timeline
And fix all the tests as we need to wait for the project to be loaded
to check the reference count of the timeline (as we keep a ref on the
timeline in project to later emit "loaded" on idle).
2013-11-09 10:35:12 -03:00
Thibault Saunier
1e5bb2edf6 timelineelement: Make sure that we will never set a negative start
Currently we can end up overflowing the start of others child of our
parent, avoid that making sure we can set our start to what was
requested by the user before actually doing it

+ Add a test
2013-07-10 23:17:54 -04:00
Thibault Saunier
a933d9540d ges: Implement a GESGroup class, subclass of GESContainer
The GESGroup class is used to group various GESContainer
together, it can contain either GESClips or GESGroup or both.