Original commit message from CVS:
* gst/schedulers/gstoptimalscheduler.c: (add_to_group),
(remove_from_group), (normalize_group), (group_migrate_connected),
(gst_opt_scheduler_iterate):
* testsuite/schedulers/.cvsignore:
* testsuite/schedulers/Makefile.am:
* testsuite/schedulers/queue_link.c: (main):
Added testcase for schduler segfault.
Fix scheduler segfault when removing a decoupled
entry point as the last element from a group.
Original commit message from CVS:
* testsuite/schedulers/147894-2.c: (queue_empty), (queue_filled),
(handoff_identity), (main):
* testsuite/schedulers/147894.c: (queue_empty), (queue_filled),
(handoff_identity), (main):
* testsuite/schedulers/Makefile.am:
* testsuite/schedulers/group_link.c: (main):
Show bug in scheduler when linking chain and loop based element
where the chain based element was not yet in a group.
Original commit message from CVS:
* testsuite/schedulers/142183-2.c: (handoff_identity), (main):
* testsuite/schedulers/142183.c: (handoff_identity), (main):
* testsuite/schedulers/Makefile.am:
Added testsuite for bug 142183 in its two incarnations. Refcount
is not increased for scheduled elements and threadsafe properties
mutexes are not properly unlocked.
Original commit message from CVS:
* testsuite/schedulers/143777-2.c: (main):
* testsuite/schedulers/147713.c: (handoff_src), (handoff_sink),
(main):
* testsuite/schedulers/Makefile.am:
Added cleanup code to testcase 143777-2.
Added testcase to show bug 147713, does not really show the
deadlock as I can't figure out how to trigger it, but it does
demonstrate bad ordering in the scheduler.
Original commit message from CVS:
* gst/schedulers/gstoptimalscheduler.c:
(chain_recursively_migrate_group), (create_group),
(schedule_group), (gst_opt_scheduler_pad_link),
(group_elements_set_visited), (element_get_reachables_func),
(element_get_reachables), (group_can_reach_group), (debug_element),
(rechain_group), (group_migrate_connected),
(gst_opt_scheduler_pad_unlink):
* testsuite/schedulers/Makefile.am:
Implemented group splitting and rechaining.
Fixes 143777 and 143777-2 in the testsuite.
Original commit message from CVS:
* testsuite/schedulers/.cvsignore:
* testsuite/schedulers/Makefile.am:
* testsuite/schedulers/143777-2.c: (main):
add test for opt breakage in bug #143777
Original commit message from CVS:
* gst/gstpad.c: (gst_pad_call_chain_function):
check for if we were unlinked while inside the chainfunction (fixes
entrygthread having issues with #143777)
* testsuite/schedulers/143777.c: (main):
* testsuite/schedulers/Makefile.am:
add a test for that fix
Original commit message from CVS:
* gst/gstbin.c: (gst_bin_iterate_func), (gst_bin_iterate):
don't
* gst/schedulers/entryscheduler.c: (safe_cothread_switch),
(safe_cothread_destroy),
(gst_entry_scheduler_remove_all_cothreads),
(gst_entry_scheduler_reset), (_remove_cothread),
(gst_entry_scheduler_state_transition):
hold off cothread destruction if we're not in main cothread
* configure.ac:
* testsuite/Makefile.am:
add new test dir
* testsuite/schedulers/.cvsignore:
* testsuite/schedulers/Makefile.am:
add tests
* testsuite/schedulers/relink.c: (cb_handoff), (main):
check relinking and adding/removing elements from a running pipeline
* testsuite/schedulers/unlink.c: (cb_handoff), (main):
check unlinking in a running pipeline
* testsuite/schedulers/unref.c: (cb_handoff), (main):
check unreffing a running pipeline
* testsuite/schedulers/useless_iteration.c: (main):
check iterating a pipeline that contains running threads works